Suitably trained and qualified technicians as well as tested and implemented standards of procedures in the course of the whole construction cycle allow efficient supervision of all the phases of performance:
- inspection of detailed and workshop designs
- control of material orders
- control of material supplies to pre-manufacturing plants
- control of the works of in pre-manufacturing plants
- control of the supplies of pre-manufactured elements and materials to the construction site
- control of assembly works
- agreements on interchangeable technical solutions
- technical control and monitoring of the progress of the works in connection with the construction schedule
- participation in technical trials and tests

| SCOPE OF WORKS
FACADE TYPES
- segment facades
- post and beam facades with load-bearing structure:
- aluminium
- steel
- wooden
- structural facades
- semi-structural facades
- point fixed glass facades
- glass fin facades
- individual facades with load-bearing structure:
- tied
- bar (profile)
- tied - profile
- double skin facades
- window and door structures
- lanterns (classless, anti-fire)
- anti-fire ironwork
- ventilated facades:
- aluminium panel siding
- zinc-titanium panel siding
- composite board panel siding
- stainless steel panel siding
- siding of aluminium corrugated sheet
- siding of stainless steel corrugated sheet
- ceramic siding
- stone siding
- blind siding
- concrete plate siding
OTHER TYPES
- whole-glass structure
- spatial and flat steel structures
- complex design of glass floors
- structures with steel mesh fill
- glass walls and pool floor slabs
|